Special rules for HV delivery substations (up to 33 kV)
HTA Electric Installation. Implementation and Exploitation
Article REF: D5026 V2
Special rules for HV delivery substations (up to 33 kV)
HTA Electric Installation. Implementation and Exploitation

Author : Dominique SERRE

Publication date: November 10, 2016 | Lire en français

Logo Techniques de l'Ingenieur You do not have access to this resource.
Request your free trial access! Free trial

Already subscribed?

4. Special rules for HV delivery substations (up to 33 kV)

4.1 Prior approval from the public distribution system operator

Prior to any installation, prior approval must be sought from the public distribution network operator regarding the planned arrangements for both the choice of delivery station equipment and its location. Any modification to the initial arrangements must also be submitted to the public network operator.

The application for prior approval from the public network operator must include the following information:

  • the position of the substation in relation to adjoining roads and indication of access roads or feeder pipe crossings;

  • the connection diagram for the delivery substation and earth circuits;

  • ...
You do not have access to this resource.
Logo Techniques de l'Ingenieur

Exclusive to subscribers. 97% yet to be discovered!

You do not have access to this resource. Click here to request your free trial access!

Already subscribed?


Ongoing reading
Special rules for HV delivery substations (up to 33 kV)

Article included in this offer

"Electricity networks and applications"

( 184 articles )

Complete knowledge base

Updated and enriched with articles validated by our scientific committees

Services

A set of exclusive tools to complement the resources

View offer details
Contact us