Article | REF: C5372 V2

Utilization of industrial by-products - Coal shales: site of Dourges

Authors: Pierre ROSSI, Ludovic GAVOIS, Guy RAOUL

Publication date: November 10, 2008 | Lire en français

You do not have access to this resource.
Click here to request your free trial access!

Already subscribed? Log in!

Automatically translated using artificial intelligence technology (Note that only the original version is binding) > find out more.

    A  |  A

    3. Multimodal platform operation

    The platform is structured around several interconnected zones (figure 4 ):

    • The terminal reception area (1) controls truck access and handles administrative formalities.

    • Handling and storage areas(2) :

      • Handling areas enable containers and swap bodies to be loaded or unloaded from lorries onto trains or barge; these areas are equipped with 750 m-long rail tracks to accommodate block trains (figures 5 and 6...

    You do not have access to this resource.

    Exclusive to subscribers. 97% yet to be discovered!

    You do not have access to this resource.
    Click here to request your free trial access!

    Already subscribed? Log in!


    The Ultimate Scientific and Technical Reference

    A Comprehensive Knowledge Base, with over 1,200 authors and 100 scientific advisors
    + More than 10,000 articles and 1,000 how-to sheets, over 800 new or updated articles every year
    From design to prototyping, right through to industrialization, the reference for securing the development of your industrial projects

    This article is included in

    Sustainable construction

    This offer includes:

    Knowledge Base

    Updated and enriched with articles validated by our scientific committees

    Services

    A set of exclusive tools to complement the resources

    Practical Path

    Operational and didactic, to guarantee the acquisition of transversal skills

    Doc & Quiz

    Interactive articles with quizzes, for constructive reading

    Subscribe now!

    Ongoing reading
    Multimodal platform operation