4. Upgrading coal shale by treatment with road binder
-
Pre-project recommendations
The following solutions were planned at the preliminary design stage of the earthworks for the Dourges multimodal platform, based on the authorized operation on the "116/117" slag heap:
use of raw shale for backfill (criterion AR1) and railway subgrades;
production of formoschist by screening, for use in road sub-base (PF2 criteria) and railway sub-base.
-
Conclusions of the market's geotechnical campaign
Project studies prior to the start of work led to the following findings, based on a representative sample of boreholes drilled in the slag heap:
a 0/150 grading curve, with 45% passing 20...
Exclusive to subscribers. 97% yet to be discovered!
Already subscribed? Log in!
Upgrading coal shale by treatment with road binder
Article included in this offer
"Sustainable construction"
(
49 articles
)
Updated and enriched with articles validated by our scientific committees
A set of exclusive tools to complement the resources