6. Mistakes to avoid
6.1 Don't neglect to prepare for the operation
Carrying out exposure measurements requires organization and planning, which must be discussed between the accredited body and the HSE manager. At the very least, the HSE manager must consult the production manager to check that the chemical will indeed be handled, and under the usual conditions to be defined, on the days of the intervention.
The choice of measurement days must be studied in advance. Carrying out measurements when the chemical is not being handled causes unnecessary expense.
SCROLL TO TOPExclusive to subscribers. 97% yet to be discovered!
Already subscribed? Log in!
Mistakes to avoid
Article included in this offer
"Chemical risk prevention manager"
(
219 articles
)
Updated and enriched with articles validated by our scientific committees
A set of exclusive tools to complement the resources
Bibliography
Also in our database
Exclusive to subscribers. 97% yet to be discovered!
Already subscribed? Log in!