Practical sheet | REF: FIC0586 V1

Apply statistical process control (SPC)

Authors: Pascal VEDEL, Jean-Michel POU

Publication date: December 10, 2011 | Lire en français

You do not have access to this resource.
Click here to request your free trial access!

Already subscribed? Log in!


3. How do you draw up a control chart to apply statistical process control to a product's target value?

To create a control chart, follow the steps below.

  • Confirm the target value to be aimed for during production. This target value is "often" set as the mid-point between the product's high and low tolerances. This target value should correspond to the average of the measured values. If this is not the case, the process is off-center and the necessary steps must be taken to bring the target value into line with the average.

  • Calculate the standard deviation of the distribution of measured values of the product characteristic under MSP.

  • Define a map on which the measured values of the value under MSP are shown on the ordinate and the time on the abscissa. Also shown on this map are the high and low values of the product tolerances, the target value and the +/-σ, +/-2σ, +/-3σ...

You do not have access to this resource.

Exclusive to subscribers. 97% yet to be discovered!

You do not have access to this resource.
Click here to request your free trial access!

Already subscribed? Log in!


The Ultimate Scientific and Technical Reference

A Comprehensive Knowledge Base, with over 1,200 authors and 100 scientific advisors
+ More than 10,000 articles and 1,000 how-to sheets, over 800 new or updated articles every year
From design to prototyping, right through to industrialization, the reference for securing the development of your industrial projects

This article is included in

Quality manager

This offer includes:

Knowledge Base

Updated and enriched with articles validated by our scientific committees

Services

A set of exclusive tools to complement the resources

Practical Path

Operational and didactic, to guarantee the acquisition of transversal skills

Doc & Quiz

Interactive articles with quizzes, for constructive reading

Subscribe now!

Ongoing reading
How do you draw up a control chart to apply statistical process control to a product's target value?