1. Define scope, references, manufacturing and logistical constraints imposed by distributors
1.1 Identify your constraints
time, quality, cost, geometry and interfaces with other parts or existing systems ;
Is it a new design or are certain elements to be retained?
does your design concern the product, the service or both?
etc.
1.2 Choose a reference
This reference may be part of your product range or come from the competition. After analyzing the...
Exclusive to subscribers. 97% yet to be discovered!
Already subscribed? Log in!
Define scope, references, manufacturing and logistical constraints imposed by distributors
Article included in this offer
"Design and engineering management"
(
337 articles
)
Updated and enriched with articles validated by our scientific committees
A set of exclusive tools to complement the resources