Define scope, references, manufacturing and logistical constraints imposed by distributors
6 key steps to organize your design project
Practical sheet REF: FIC0868 V1
Define scope, references, manufacturing and logistical constraints imposed by distributors
6 key steps to organize your design project

Author : Jean-Claude CORBEL

Publication date: April 10, 2012 | Lire en français

Logo Techniques de l'Ingenieur You do not have access to this resource.
Request your free trial access! Free trial

Already subscribed?

1. Define scope, references, manufacturing and logistical constraints imposed by distributors

1.1 Identify your constraints

  • time, quality, cost, geometry and interfaces with other parts or existing systems ;

  • Is it a new design or are certain elements to be retained?

  • does your design concern the product, the service or both?

  • etc.

SCROLL TO TOP

1.2 Choose a reference

This reference may be part of your product range or come from the competition. After analyzing the...

You do not have access to this resource.
Logo Techniques de l'Ingenieur

Exclusive to subscribers. 97% yet to be discovered!

You do not have access to this resource. Click here to request your free trial access!

Already subscribed?


Ongoing reading
Define scope, references, manufacturing and logistical constraints imposed by distributors

Article included in this offer

"Design and engineering management"

( 337 articles )

Complete knowledge base

Updated and enriched with articles validated by our scientific committees

Services

A set of exclusive tools to complement the resources

View offer details