Practical sheet | REF: FIC1244 V1

From need to specification: case study

Author: Serge SIBONY

Publication date: March 10, 2015 | Lire en français

You do not have access to this resource.
Click here to request your free trial access!

Already subscribed? Log in!


6. Mistakes to avoid

6.1 Don't try to be all things to all people

Answering all questions related to main functions (FP) or constraints (FC) at all costs is an unattainable goal. It is acceptable to have 50% of questions unanswered because they are not applicable.

SCROLL TO TOP

6.2 Don't overlook one PS-related question because it's too close to another

Each FP or CF question must be answered when it makes sense, because small variations can appear and become fundamental to the project.

You do not have access to this resource.

Exclusive to subscribers. 97% yet to be discovered!

You do not have access to this resource.
Click here to request your free trial access!

Already subscribed? Log in!


The Ultimate Scientific and Technical Reference

A Comprehensive Knowledge Base, with over 1,200 authors and 100 scientific advisors
+ More than 10,000 articles and 1,000 how-to sheets, over 800 new or updated articles every year
From design to prototyping, right through to industrialization, the reference for securing the development of your industrial projects

This article is included in

Design and engineering management

This offer includes:

Knowledge Base

Updated and enriched with articles validated by our scientific committees

Services

A set of exclusive tools to complement the resources

Practical Path

Operational and didactic, to guarantee the acquisition of transversal skills

Doc & Quiz

Interactive articles with quizzes, for constructive reading

Subscribe now!

Ongoing reading
Mistakes to avoid