2. Section B: direct costs and material costs
This section, placed below section B, has the same format and includes most of the fields indicated in the section dealing with human resources.
This section describes the costs of purchasing equipment and materials for each work package (WP), as well as travel expenses. Costs are expressed in euros or pounds sterling, using the same rules as above.
Certain fields are no longer required to describe costs linked to material costs, such as the "LAB" column and the notion of "Overtime".