3. Resource forecasting in MS Project 2007 and 2010
Before you start assigning resources, you need to enter all the information you've gathered about the resources, their origin (internal or external, the groups and work packages concerned) and their cost. This will save you time and improve quality when allocating project resources. Versions of MS Project 2007 and 2010 offer allocation and control modes for labor and material resources, as well as a task inspector to optimize audit functions.
3.1 Allocate resources
Work resources can be allocated in two different ways: by the load distributed uniformly over the entire duration of the work, or on a variable daily basis, without altering the resource's overall work schedule. Equipment resources and material resources are subject to specific allocation criteria,...
Exclusive to subscribers. 97% yet to be discovered!
You do not have access to this resource.
Click here to request your free trial access!
Already subscribed? Log in!
The Ultimate Scientific and Technical Reference
This article is included in
Design and engineering management
This offer includes:
Knowledge Base
Updated and enriched with articles validated by our scientific committees
Services
A set of exclusive tools to complement the resources
Practical Path
Operational and didactic, to guarantee the acquisition of transversal skills
Doc & Quiz
Interactive articles with quizzes, for constructive reading
Resource forecasting in MS Project 2007 and 2010
Practical recommendations
To download MS Project 2007 service pack 2 : https://www.microsoft.com/fr-fr/download/details.aspx?id=8230
MS Project 2007 is no longer on the market, but you'll find a range of highly detailed guides in major used book stores.
...
Exclusive to subscribers. 97% yet to be discovered!
You do not have access to this resource.
Click here to request your free trial access!
Already subscribed? Log in!
The Ultimate Scientific and Technical Reference