Resource forecasting in MS Project 2007 and 2010
MS Project 2007 and 2010: building forecasts
Archive REF: FIC0804 V1
Resource forecasting in MS Project 2007 and 2010
MS Project 2007 and 2010: building forecasts

Author : Sophie TOUBLANC

Publication date: May 10, 2014 | Lire en français

Logo Techniques de l'Ingenieur You do not have access to this resource.
Request your free trial access! Free trial

Already subscribed?

3. Resource forecasting in MS Project 2007 and 2010

Before you start assigning resources, you need to enter all the information you've gathered about the resources, their origin (internal or external, the groups and work packages concerned) and their cost. This will save you time and improve quality when allocating project resources. Versions of MS Project 2007 and 2010 offer allocation and control modes for labor and material resources, as well as a task inspector to optimize audit functions.

3.1 Allocate resources

Work resources can be allocated in two different ways: by the load distributed uniformly over the entire duration of the work, or on a variable daily basis, without altering the resource's overall work schedule. Equipment resources and material resources are subject to specific allocation criteria,...

You do not have access to this resource.
Logo Techniques de l'Ingenieur

Exclusive to subscribers. 97% yet to be discovered!

You do not have access to this resource. Click here to request your free trial access!

Already subscribed?


Ongoing reading
Resource forecasting in MS Project 2007 and 2010

Article included in this offer

"Design and engineering management"

( 337 articles )

Complete knowledge base

Updated and enriched with articles validated by our scientific committees

Services

A set of exclusive tools to complement the resources

View offer details