Practical sheet | REF: FIC0356 V1

Guiding a project through TRIZ: the laws of evolution of technical systems

Author: Denis CAVALUCCI

Publication date: May 10, 2014 | Lire en français

You do not have access to this resource.
Click here to request your free trial access!

Already subscribed? Log in!


2. Estimation of technical system maturity

Based on the analyses in step 1, estimate on a scale of 1 to 5 the technical system's ability to comply with the law, then plot these estimates on a radar diagram.

In the case of the watering can, and depending on the discussions in the previous step, we could have the distribution given in figure 3.

You do not have access to this resource.

Exclusive to subscribers. 97% yet to be discovered!

You do not have access to this resource.
Click here to request your free trial access!

Already subscribed? Log in!


The Ultimate Scientific and Technical Reference

A Comprehensive Knowledge Base, with over 1,200 authors and 100 scientific advisors
+ More than 10,000 articles and 1,000 how-to sheets, over 800 new or updated articles every year
From design to prototyping, right through to industrialization, the reference for securing the development of your industrial projects

This article is included in

Management and innovation engineering

This offer includes:

Knowledge Base

Updated and enriched with articles validated by our scientific committees

Services

A set of exclusive tools to complement the resources

Practical Path

Operational and didactic, to guarantee the acquisition of transversal skills

Doc & Quiz

Interactive articles with quizzes, for constructive reading

Subscribe now!

Ongoing reading
Estimation of technical system maturity