Design of discontinuous workshops
Batch shop scheduling and design
Archive REF: AG3010 V1
Design of discontinuous workshops
Batch shop scheduling and design

Author : Catherine AZZARO-PANTEL

Publication date: July 10, 2005 | Lire en français

Logo Techniques de l'Ingenieur You do not have access to this resource.
Request your free trial access! Free trial

Already subscribed?

3. Design of discontinuous workshops

3.1 Introduction to design and remodeling

The problem of designing batch plants is a major industrial issue, and forms part of a series of decisions ranging from the definition of the company's strategic choices to the optimization of production (figure 9 ). Increasingly, the current economic context is making the empiricist approach to workshop design, which in many cases led to over-equipment, untenable.

The aim of design is to determine the number and dimensions of the equipment required for each of the unit operations involved in the manufacturing processes of the various products, in order to ensure a given level of production, while...

You do not have access to this resource.
Logo Techniques de l'Ingenieur

Exclusive to subscribers. 97% yet to be discovered!

You do not have access to this resource. Click here to request your free trial access!

Already subscribed?


Ongoing reading
Design of discontinuous workshops

Article included in this offer

"Drugs and pharmaceuticals"

( 123 articles )

Complete knowledge base

Updated and enriched with articles validated by our scientific committees

Services

A set of exclusive tools to complement the resources

View offer details