Practical sheet | REF: FIC0490 V1

Comply with your prefectoral decree. How can I be sure?

Author: Solange VIGER

Publication date: September 10, 2014, Review date: November 14, 2016 | Lire en français

You do not have access to this resource.
Click here to request your free trial access!

Already subscribed? Log in!


2. Check that an installation complies with applicable requirements

Regulatory compliance means complying with the applicable requirements. This means reviewing all the applicable requirements defined in the prefectoral decree, and comparing them with the reality on the ground.

2.1 Compliance topics

Verification of plant compliance covers all the topics listed in the various prefectoral decrees relating to your plant.

These themes are themselves derived from ministerial decrees applicable to classified facilities subject to authorization.

There are two types of ministerial orders concerning Seveso installations:

  • The

You do not have access to this resource.

Exclusive to subscribers. 97% yet to be discovered!

You do not have access to this resource.
Click here to request your free trial access!

Already subscribed? Log in!


The Ultimate Scientific and Technical Reference

A Comprehensive Knowledge Base, with over 1,200 authors and 100 scientific advisors
+ More than 10,000 articles and 1,000 how-to sheets, over 800 new or updated articles every year
From design to prototyping, right through to industrialization, the reference for securing the development of your industrial projects

This article is included in

Environment

This offer includes:

Knowledge Base

Updated and enriched with articles validated by our scientific committees

Services

A set of exclusive tools to complement the resources

Practical Path

Operational and didactic, to guarantee the acquisition of transversal skills

Doc & Quiz

Interactive articles with quizzes, for constructive reading

Subscribe now!

Ongoing reading
Check that an installation complies with applicable requirements