6. Frequently asked questions
Am I obliged to deal systematically with all the topics presented in the various stages above?
Yes. However, as indicated above in the "our advice" paragraph, there's no point in giving details of elements that wouldn't contribute to a better understanding of the site and its surroundings and/or the dossier.
For example, don't dwell on the impact on flora and fauna when the project is located in the heart of an industrial zone and the activity will not discharge into the water system or into the air.
Where are the limits of the environment to be taken into account?
These limits must be assessed on a case-by-case basis. They depend on a number of criteria, in particular the size of the project footprint (a few thousand square meters or several hectares), the characteristics of the surrounding...
Exclusive to subscribers. 97% yet to be discovered!
Already subscribed? Log in!
Frequently asked questions
Article included in this offer
"Environment"
(
514 articles
)
Updated and enriched with articles validated by our scientific committees
A set of exclusive tools to complement the resources
Bibliography
Also in our database
Bibliography
Installations classées pour la protection de l'environnement (ICPE). Dossier de demande d'autorisation d'exploiter (DDAE) G 1 018 by G. GIRIN in Environnement 2009
Installations classées pour la protection de l'environnement (ICPE). Dossier de demande d'autorisation d'exploiter (DDAE) G 4 150 by G. GIRIN in Environnement 2009
Regulations
-
Articles L. 122-1 et seq. and R. 122-2 et seq.