Why an NHS?
Drawing up health and safety instructions (NHS)
Practical sheet REF: FIC0028 V1
Why an NHS?
Drawing up health and safety instructions (NHS)

Author : Gérard GIRIN

Publication date: April 10, 2011 | Lire en français

Logo Techniques de l'Ingenieur You do not have access to this resource.
Request your free trial access! Free trial

Already subscribed?

1. Why an NHS?

The fact that a plant is classified as an "Installation Classée pour la Protection de l'Environnement" (ICPE), and is therefore required to comply with the French Environmental Code, does not exempt it from the requirements of the French Labor Code. It will be up to the NHS to demonstrate compliance with the latter.

The NHS is an integral part of the ICPE EAD file. The aim is to ensure that the measures taken will enable workers on a site (whether they are employees of the company or come from outside) to work in good hygienic conditions and in complete safety.

The first three chapters of an AED file deal with environmental protection issues. The corresponding regulations (Environmental Code) are independent of those concerning worker protection (Labor Code), which are more specifically covered by the NHS.

These...

You do not have access to this resource.
Logo Techniques de l'Ingenieur

Exclusive to subscribers. 97% yet to be discovered!

You do not have access to this resource. Click here to request your free trial access!

Already subscribed?


Article included in this offer

"Environment"

( 514 articles )

Complete knowledge base

Updated and enriched with articles validated by our scientific committees

Services

A set of exclusive tools to complement the resources

View offer details