5. Mistakes to avoid
5.1 Don't overlook regulatory requirements arising from urban planning documents and environmental plans and schemes
The operator of a classified facility subject to registration must ensure that his existing or planned activities are compatible with town planning documents (land use plan, local town planning plan, local map, territorial coherence plan), Natura 2000 sites, and environmental plans, schemes and programs, in particular water development and management master plans, waste prevention and management plans, territorial climate and energy plans... If these requirements are not taken into account, the operator is exposed to the possibility of a switch to a classified facility authorization procedure: They will then have to submit an impact study and a hazard study, and go...
Exclusive to subscribers. 97% yet to be discovered!
Already subscribed? Log in!
Mistakes to avoid
Article included in this offer
"Environment"
(
514 articles
)
Updated and enriched with articles validated by our scientific committees
A set of exclusive tools to complement the resources