What external risks need to be taken into account in a hazard analysis?
Hazard analysis: identifying external risks
Practical sheet REF: FIC0205 V1
What external risks need to be taken into account in a hazard analysis?
Hazard analysis: identifying external risks

Author : Frédérique FAGES

Publication date: April 10, 2014 | Lire en français

Logo Techniques de l'Ingenieur You do not have access to this resource.
Request your free trial access! Free trial

Already subscribed?

1. What external risks need to be taken into account in a hazard analysis?

There are two types of external risks that can present hazards for an industrial facility:

  • hazards of natural origin;

  • risks of technological and human origin.

1.1 Natural hazards

They are also called "natural sources of aggression" and can have several origins:

  • Extreme weather conditions such as hail, frost, heatwave, snow, fog, ice, floods and/or avalanches. Ten-year floods, for example, must be taken into account to determine the amount of meteoric rainfall that can wash away waterproofed soils on an industrial site.

  • Extreme weather conditions, i.e. storms, lightning, cyclones and...

You do not have access to this resource.
Logo Techniques de l'Ingenieur

Exclusive to subscribers. 97% yet to be discovered!

You do not have access to this resource. Click here to request your free trial access!

Already subscribed?


Article included in this offer

"Environment"

( 514 articles )

Complete knowledge base

Updated and enriched with articles validated by our scientific committees

Services

A set of exclusive tools to complement the resources

View offer details