5. Mistakes to avoid
5.1 Don't forget to attach the building permit receipt to the declaration file.
Failure to attach the building permit receipt to the declaration file may prevent the declaration receipt from being issued.
If the project to operate a classified facility subject to declaration requires the construction of an industrial building subject to building permit, the latter must be submitted to the relevant authorities at the same time as the declaration. The authorities in charge of urban planning and the classified facility inspectorate are responsible for checking the overall coherence of the project, and its validity in relation to other applicable requirements. The inspectorate will thus check that the declaration includes a receipt for the filing of a permit....
Exclusive to subscribers. 97% yet to be discovered!
You do not have access to this resource.
Click here to request your free trial access!
Already subscribed? Log in!
The Ultimate Scientific and Technical Reference
This article is included in
Environment
This offer includes:
Knowledge Base
Updated and enriched with articles validated by our scientific committees
Services
A set of exclusive tools to complement the resources
Practical Path
Operational and didactic, to guarantee the acquisition of transversal skills
Doc & Quiz
Interactive articles with quizzes, for constructive reading
Mistakes to avoid
Regulatory references
titre 1 er du livre V, articles L. 512-8 à L. 512-13 (installations subject to declaration)
articles R. 512-47 to R. 512-66 (facilities subject to declaration)...
Exclusive to subscribers. 97% yet to be discovered!
You do not have access to this resource.
Click here to request your free trial access!
Already subscribed? Log in!
The Ultimate Scientific and Technical Reference