3. Prepare the Internal Operations Plan
The POI can only be drawn up on the basis of a hazard study including an analysis of the various possible accident scenarios, their most damaging consequences and the resources to be deployed.
It describes the technical, organizational and management measures required to reduce the probability and effects of hazardous phenomena, and to influence their kinetics.
The content of the hazard study has evolved towards a strengthening of risk analysis, with the transposition into national law of Directive n°2012/18/EU known as the "Seveso 3 Directive" on the control of major-accident hazards involving dangerous substances. The ministerial decree of May 26, 2014 sets out the terms of the new content of the hazard study, as it will have to be carried out from 1 er June 2015.
...
Exclusive to subscribers. 97% yet to be discovered!
Already subscribed? Log in!
Prepare the Internal Operations Plan
Article included in this offer
"Environment"
(
514 articles
)
Updated and enriched with articles validated by our scientific committees
A set of exclusive tools to complement the resources
Editor's note
This article is an updated version of the fact sheet written by Sandrine CHEVILLON.
Regulatory reference
Exclusive to subscribers. 97% yet to be discovered!
Already subscribed? Log in!