8. Organization of site preparation
Site preparation depends on the size and complexity of the operation, but also, and above all, on the degree of progress made in drawing up the documents described above (figure 5):
list of speakers ;
site review and connection projects ;
PEO (plan d'exécution des ouvrages) and construction schedule ;
list of technical justifications ;
list of special points ;
list of hot spots ;
interface list ;
list of stopping points and critical points: control points ;
list of DOE (dossier de l'ouvrage exécuté) and DIU (dossier...
You do not have access to this resource.
Exclusive to subscribers. 97% yet to be discovered!
Already subscribed?
Log in!
Ongoing reading
Organization of site preparation
Bibliography
Also in our database
-
PAUCHET (W.) - Responsabilités en matière d'hygiène, de santé et de sécurité - [TBA 233]...
Standards and norms
- Private markets – Sample notebooks – Cahier des clauses administratives générales applicable aux travaux de bâtiment faisant l'objet de marchés privés - NF P03-001 - Octobre 2017
Regulations
Law no. 93-1418 of December 31, 1993 amending the provisions of the Labor Code applicable to building and civil engineering operations with a view to ensuring the safety and protecting the health of workers, and transposing Council of the European Communities directive no. 92-57 of June 24, 1992.
Decree no. 99-756 of August 31, 1999 on technical requirements for disabled access to public or private roadways open to public traffic,...
You do not have access to this resource.
Exclusive to subscribers. 97% yet to be discovered!
Already subscribed?
Log in!