7. Timeframes for site preparation and execution
In accordance with article 7 of the standard, the following must be taken into consideration
NF P03-001
deadlines :
preparation ;
performance.
-
Preparation time
The preparation period is the time required to prepare the documents. This period begins the day after the contractor is notified of the conclusion of his contract. The duration of the preparation period is that specified in the SCC; otherwise, it is 3 months.
-
Breakdown of lead time
The time required to carry...