5. Conclusion
The study of formwork rotation is very important because formwork is expensive: any error is costly and leads to a loss of time. You also need to take into account the setting time of the concrete, which enters into the calculation of the rotation cycle. This study can make or break a project, which is important for the life of the company. Every extra hour spent studying specific points saves the job site around 10 to 20 hours. Using too much formwork equipment prevents the site from being profitable, but if you don't have enough equipment, you risk delay penalties.