1. Main project periods

  • A project often takes the form of a sequence of events and activities that are not necessarily carried out by the same operators. A distinction can almost always be made between :

    • an initial period, from the initial project idea to the formal decision to carry it out;

    • a second period, from this decision to the application of the result.

These two periods may overlap.

  • The first period is entirely under the responsibility of the decision-making body, which will often (but not always) be the owner and operator (directly or otherwise). Various stakeholders may participate in this decision, which must lead, among other things, to the more or less elaborate definition of the project's objectives...

You do not have access to this resource.
Logo Techniques de l'Ingenieur

Exclusive to subscribers. 97% yet to be discovered!

You do not have access to this resource. Click here to request your free trial access!

Already subscribed?


Article included in this offer

"Design and production"

( 147 articles )

Complete knowledge base

Updated and enriched with articles validated by our scientific committees

Services

A set of exclusive tools to complement the resources

View offer details

Dans les ressources documentaires

Élaboration d'un cahier des charges fonctionnel - Méthodologie et informatisation

Fonction de l'emballage, marketing et design, protection de l'environnement, coût, contraintes logistique...

Contrats de l’ingénierie - Maîtrise d’œuvre

Cet article a pour sujet le contrat de maîtrise d’œuvre, le contrat le plus rencontré et le plus spécifiq...

Contrats de l’ingénierie - Annexe 1 : Dispositions administratives

Cet article a pour objet la présentation de l’ensemble des dispositions administratives d’un contrat de m...

WhitePaper
17 November 2015
Génie industriel - 3 fiches pratiques

Découvrez les fiches pratiques éditées par Techniques de l'Ingénieur à travers 3 exemples à télécharger : Mettre en œuvre un projet PLM au sein de l’entreprise ...

Tous les livres blancs
Article L'économie circulaire teste sa première norme
25 October 2018
L'économie circulaire teste sa première norme

L'Afnor dévoile une première mondiale : la première norme expérimentale consacrée à l'économie circulaire. Elle vise à mieux faire connaître ce modèle économiqu...

Toutes les actualités
Contact us