Costs and construction time
KERENA an average power passive safety boiling water reactor.

Add to my library

BN3135 V1 Article

Costs and construction time


KERENA an average power passive safety boiling water reactor.

Author : Werner BRETTSCHUH

Publication date: July 10, 2011 | Lire en français

Add to my library Add to my library

Logo Techniques de l'Ingenieur You do not have access to this resource.
Request your free trial access! Free trial

Already subscribed?

7. Costs and construction time

As mentioned above, it has been possible to significantly reduce the plant's construction costs (table 3 ) through simplifications that reduce operating, inspection and maintenance costs, as well as staffing requirements. The result is a lower cost of electricity production than other nuclear power plants in operation, for the same fuel consumption.

The smaller internal volumes of the buildings, the reduction in the number of components and the use of high-performance construction processes mean that construction times can be reduced to 48 months, from the first concrete pour to provisional acceptance.

...
You do not have access to this resource.
Logo Techniques de l'Ingenieur

Exclusive to subscribers. 97% yet to be discovered!

You do not have access to this resource. Click here to request your free trial access!

Already subscribed?


Article included in this offer

"Nuclear engineering"

( 161 articles )

Complete knowledge base

Updated and enriched with articles validated by our scientific committees

Services

A set of exclusive tools to complement the resources

View offer details

Dans les ressources documentaires

Approche de la sûreté des réacteurs nucléaires de génération III en France

La nécessité d'une amélioration du niveau de sûreté des futurs réacteurs par rapport à celui des réacteur...

Transport et atténuation des rayonnements

Cet article présente les différentes méthodes de calcul utilisables pour le dimensionnement des protectio...

Tous les livres blancs
Toutes les actualités
Contact us