4. Calculate the profitability of your system
You'll be able to add value to your project by using this system responsibly.
4.1 Ensuring the financial profitability of a new heat recovery project
Ensuring the financial profitability of a new heat recovery project requires several phases to be carried out rigorously.
Phase 1: Evaluate the investment costs (CAPEX) associated with the recovery system. In addition to heavy equipment such as heat recovery units and heat exchangers, boilers or even chillers, include the cost of technical studies, fluid systems (piping, valves, thermal insulation as well as pumps and fans), electrical and control systems. Include any public subsidies (Ademe's Fonds Chaleur) and specific grants such as CEE.
...
Exclusive to subscribers. 97% yet to be discovered!
You do not have access to this resource.
Click here to request your free trial access!
Already subscribed? Log in!
The Ultimate Scientific and Technical Reference
This article is included in
Energy resources and storage
This offer includes:
Knowledge Base
Updated and enriched with articles validated by our scientific committees
Services
A set of exclusive tools to complement the resources
Practical Path
Operational and didactic, to guarantee the acquisition of transversal skills
Doc & Quiz
Interactive articles with quizzes, for constructive reading
Calculate the profitability of your system
Bibliography
Also in our database
Regulations
Décret n° 2019-771 du 23 juillet 2019 . This decree, known as the tertiary sector decree, requires industrial sites of over 1,000 m 2 to reduce their energy consumption by 40% by 2030.
Websites
Association of over a hundred heat exchanger manufacturers and integrators.
Industrial association for energy efficiency, including a CEE club presenting all standard CEE operation sheets.
Exclusive to subscribers. 97% yet to be discovered!
You do not have access to this resource.
Click here to request your free trial access!
Already subscribed? Log in!
The Ultimate Scientific and Technical Reference