6. How do you prepare the site, install hydrogen equipment on site, commission it, operate and maintain the plant?
6.1 What does site preparation, hydrogen equipment installation and commissioning entail?
Beforehand :
prepare the site (brush clearing, land clearing, site demarcation) ;
organize the site ;
set up the base and security ;
civil engineering and external works (foundations, earthworks and decontamination, roads, networks and landscaping, fences and gates);
carry out electrical engineering work (cable trays, power supply).
Then, for the hydrogen infrastructure installation phase, the recommendations are as follows.
Agree...
Exclusive to subscribers. 97% yet to be discovered!
Already subscribed? Log in!
How do you prepare the site, install hydrogen equipment on site, commission it, operate and maintain the plant?
Article included in this offer
"Energy resources and storage"
(
200 articles
)
Updated and enriched with articles validated by our scientific committees
A set of exclusive tools to complement the resources
Bibliography
Also in our database
Exclusive to subscribers. 97% yet to be discovered!
Already subscribed? Log in!