5. Acceptance of work
This is the final stage in the renovation process, and is of the utmost importance. A meticulous visit with all the trades and a detailed inventory of fixtures must precede the phase of accepting or rejecting the work. In the event of a dispute, any reservations must be recorded on the acceptance report. Instructions for use and/or operation of new equipment must be obtained. In the case of a maintenance contract, a copy of the contract must be obtained.
Exclusive to subscribers. 97% yet to be discovered!
You do not have access to this resource.
Click here to request your free trial access!
Already subscribed? Log in!
The Ultimate Scientific and Technical Reference
This article is included in
Energy resources and storage
This offer includes:
Knowledge Base
Updated and enriched with articles validated by our scientific committees
Services
A set of exclusive tools to complement the resources
Practical Path
Operational and didactic, to guarantee the acquisition of transversal skills
Doc & Quiz
Interactive articles with quizzes, for constructive reading
Acceptance of work
Bibliography
Rénovation des bâtiments & performance énergétique , Brigitte VU and Pascal LAUDE - Édition Dunod (2020).
RE2020 et la rénovation énergétique / Guide pratique - SENOVA, Éditions Eyrolles (2021).
Guide RE 2020/Eco-construire pour le confort de tous.
Regulations
Article R. 172-10-1 of the décret n° 2021-1004 du 29 juillet 2021 .
Normative reference
Exclusive to subscribers. 97% yet to be discovered!
You do not have access to this resource.
Click here to request your free trial access!
Already subscribed? Log in!
The Ultimate Scientific and Technical Reference