Archive | REF: FIC1781 V1

Successful energy renovation of industrial premises

Author: Léon NOUINDE

Publication date: November 10, 2022 | Lire en français

You do not have access to this resource.
Click here to request your free trial access!

Already subscribed? Log in!


5. Acceptance of work

This is the final stage in the renovation process, and is of the utmost importance. A meticulous visit with all the trades and a detailed inventory of fixtures must precede the phase of accepting or rejecting the work. In the event of a dispute, any reservations must be recorded on the acceptance report. Instructions for use and/or operation of new equipment must be obtained. In the case of a maintenance contract, a copy of the contract must be obtained.

SCROLL TO TOP
You do not have access to this resource.

Exclusive to subscribers. 97% yet to be discovered!

You do not have access to this resource.
Click here to request your free trial access!

Already subscribed? Log in!


The Ultimate Scientific and Technical Reference

A Comprehensive Knowledge Base, with over 1,200 authors and 100 scientific advisors
+ More than 10,000 articles and 1,000 how-to sheets, over 800 new or updated articles every year
From design to prototyping, right through to industrialization, the reference for securing the development of your industrial projects

This article is included in

Energy resources and storage

This offer includes:

Knowledge Base

Updated and enriched with articles validated by our scientific committees

Services

A set of exclusive tools to complement the resources

Practical Path

Operational and didactic, to guarantee the acquisition of transversal skills

Doc & Quiz

Interactive articles with quizzes, for constructive reading

Subscribe now!

Ongoing reading
Acceptance of work