ABSTRACT

As bridges are engineering work which is destined to last for several decades and even centuries, they are bound to suffer from damage and disruption. The causes are diverse: climatic disturbances (wind, rain, earthquakes), ageing materials, accidents, eventual consequences of the traffic. It is thus necessary to regularly assess the state of the structure and the equipment ion order to verify the good functioning and security of the bridge. When a reinforcement or repair is required, methodologies are to be followed and principles are to be respected. This article notably focuses on the case of metallic bridges and details the main repair methods as well as the measures to be implemented in order to prevent future deteriorations.

Read this article from a comprehensive knowledge base, updated and supplemented with articles reviewed by scientific committees.

Read the article

AUTHORS

  • Daniel POINEAU : Ingénieur divisionnaire des Travaux Publics de l'Etat – Former Technical Director of Sétra's Major Structures Division - Professor at the École nationale des Travaux Publics de l'État, the École spéciale des Travaux Publics and the École supérieure des ingénieurs des Travaux de la Construction - Consultant

  • Jean-Armand CALGARO : Engineer General of Ponts et Chaussées - Permanent member of the Conseil Général de l'Environnement et du Développement Durable (General Council for the Environment and Sustainable Development) - Professor at the Centre des Hautes Études de la Construction - This edition is an update of the article by Roger LACROIX and Jean-Armand CALGARO, entitled Projet de renforcement ou de réparation d'un pont, published in 1999.

 INTRODUCTION

An existing bridge was designed to provide a certain service. However, due to design and/or execution errors, ageing materials, environmental attacks, aggressive traffic, accidental actions, etc., the bridge may be in disrepair and no longer provide the intended service. It is therefore necessary to repair or even replace it.

In some cases, the load-bearing capacity and geometry of an existing bridge are no longer adapted to the new needs arising from increased traffic and loads. In most cases, this means reinforcing the structure.

The 1 er part of this dossier, [C 7 803] , dealt with "methodology" issues. The second, [C 7 804] , deals with the repair and protection of concrete and reinforcement. The third, [C 7 805] , deals with repair and reinforcement methods using additional reinforcement.

The fourth and final section focuses on steel bridges.

This dossier follows on from [C 7 402] , [C 7 403] , [C 7 404]...

You do not have access to this resource.
Logo Techniques de l'Ingenieur

Exclusive to subscribers. 97% yet to be discovered!

You do not have access to this resource. Click here to request your free trial access!

Already subscribed?


Ongoing reading
Bridge reinforcement or repair project. Case of a mettalic bridge

Article included in this offer

"Pathologies and building rehabilitation"

( 51 articles )

Complete knowledge base

Updated and enriched with articles validated by our scientific committees

Services

A set of exclusive tools to complement the resources

View offer details

Dans les ressources documentaires

Projet de renforcement ou de réparation d'un pont - Par armatures additionnelles

Le vieillissement des matériaux, les attaques de l'environnement, l'augmentation du trafic et des charges...

Projet de renforcement ou de réparation d'un pont - Réparation, protection du béton et des armatures

Un pont existant a été conçu pour assurer un certain service. Cependant, à cause d'erreurs de conception ...

Projet de renforcement ou de réparation d'un pont - Méthodologie

Un pont existant peut, avec le temps et pour diverses raisons de vieillissement et de corrosion de ses ma...

Adaptation à de nouvelles charges, mise aux normes thermiques et acoustiques

L’exposé développe les problématiques de mise en conformité des constructions à l’aide de l’acier, mais a...

WhitePaper
17 March 2020
Les bétons auto-plaçants

Les bétons auto-plaçants constituent la dernière évolution en date des bétons utilisés pour la construction d’ouvrages de bâtiment et de génie civil

Tous les livres blancs
Article Faciliter le «Facility Management»
27 June 2018
Faciliter le «Facility Management»

Connectée aux installations techniques, la maquette BIM compose un avatar numérique et dynamique, utile aux opérations d'exploitation et de maintenance.

Toutes les actualités
Contact us