On-site maintenance
Tower crane features

Add to my library

TBA713 V1 Quizzed article

On-site maintenance


Tower crane features

Author : Pierre Serin

Publication date: August 10, 2021 | Lire en français

Add to my library Add to my library

Logo Techniques de l'Ingenieur You do not have access to this resource.
Request your free trial access! Free trial

Already subscribed?

4. On-site maintenance

4.1 General

The instructions given in the manufacturer's operating and maintenance manual must be scrupulously followed.

Before any work is started, access and manoeuvring bans must be placed on the controls. Remember that maintenance must be carried out by specialized personnel, i.e. the crane operator if he or she has been trained to do so, or by a trained millwright; maintenance must be carried out with the machine at a standstill.

Some operations require the equipment to be started up. At this point, the crane operator must be at his post and in constant contact with maintenance personnel.

Work on electrical cabinets requires specific authorization.

It is forbidden to work under...

You do not have access to this resource.
Logo Techniques de l'Ingenieur

Exclusive to subscribers. 97% yet to be discovered!

You do not have access to this resource. Click here to request your free trial access!

Already subscribed?


Article included in this offer

"Preparing for construction"

( 117 articles )

Complete knowledge base

Updated and enriched with articles validated by our scientific committees

Services

A set of exclusive tools to complement the resources

View offer details
WhitePaper VLEP et exposition aux produits chimiques
19 October 2016
VLEP et exposition aux produits chimiques

Découvrez dans ce livre blanc comment les Valeurs Limites d’Exposition Professionnelle (VLEP) sont déterminées et comment optimiser le mesurage de l’exposition ...

Tous les livres blancs
Toutes les actualités
Contact us