5. Civil engineering structures
-
Accessibility of structures
All parts of a collective pipe, specialized premises or locations (common section, columns, collective branches, connection communication circuits, metering room) must be installed in common areas in such a way that DSO agents can access the facilities at all times and carry out their work and inspections properly.
-
Location of the main circuit breaker
The individual or collective main circuit breaker (CCPI or CCPC) is placed on a vertical wall and accessible from the public domain, without crossing a controlled access point. This requirement applies to underground connections and, in accordance with paragraph 551.1.2 of standard NF C 15-100, to producer connections coming from outside buildings. In the case of a public distribution...
Exclusive to subscribers. 97% yet to be discovered!
Already subscribed? Log in!
Civil engineering structures
Article included in this offer
"Electricity networks and applications"
(
186 articles
)
Updated and enriched with articles validated by our scientific committees
A set of exclusive tools to complement the resources
Bibliography
Exclusive to subscribers. 97% yet to be discovered!
Already subscribed? Log in!