4. Assessing available risk management resources
For each situation described in steps 1 to 3 above :
Establish the existing measures that can play a role in chemical risk prevention: ventilation of premises, hygiene, storage, equipment safety (valves, air extraction, etc.).
List the collective protection equipment available, its operation and condition.
Note the organizational measures in force at this workstation: staff training, safety instructions, type of PPE provided.
When you have access to technical data enabling you to qualify the performance of these control devices, make a note of them too: extraction rates, air renewal rates, PPE characteristics or standards, results of existing controls.
Exclusive to subscribers. 97% yet to be discovered!
Already subscribed? Log in!
Assessing available risk management resources
Article included in this offer
"Chemical risk prevention manager"
(
219 articles
)
Updated and enriched with articles validated by our scientific committees
A set of exclusive tools to complement the resources
Exclusive to subscribers. 97% yet to be discovered!
Already subscribed? Log in!