4. Assessing available risk management resources
For each situation described in steps 1 to 3 above :
Establish the existing measures that can play a role in chemical risk prevention: ventilation of premises, hygiene, storage, equipment safety (valves, air extraction, etc.).
List the collective protection equipment available, its operation and condition.
Note the organizational measures in force at this workstation: staff training, safety instructions, type of PPE provided.
When you have access to technical data enabling you to qualify the performance of these control devices, make a note of them too: extraction rates, air renewal rates, PPE characteristics or standards, results of existing controls.
Exclusive to subscribers. 97% yet to be discovered!
You do not have access to this resource.
Click here to request your free trial access!
Already subscribed? Log in!
The Ultimate Scientific and Technical Reference
This article is included in
Chemical risk prevention manager
This offer includes:
Knowledge Base
Updated and enriched with articles validated by our scientific committees
Services
A set of exclusive tools to complement the resources
Practical Path
Operational and didactic, to guarantee the acquisition of transversal skills
Doc & Quiz
Interactive articles with quizzes, for constructive reading
Assessing available risk management resources
Downloadable tools
Exclusive to subscribers. 97% yet to be discovered!
You do not have access to this resource.
Click here to request your free trial access!
Already subscribed? Log in!
The Ultimate Scientific and Technical Reference