8. Our advice
8.1 Draw up a list of data applicable to the design project
The reformulation of a specification in the form of a list of points to be verified, tracked in a table, with for each point the verification action and its expected result, makes it possible to track the input data and their evolutions (version & date) throughout the project. It is established during the review of input elements (requirements) and is kept up to date during the design review stage.
SCROLL TO TOP8.2 Set up a tool to monitor actions taken
...
Exclusive to subscribers. 97% yet to be discovered!
You do not have access to this resource.
Click here to request your free trial access!
Already subscribed? Log in!
The Ultimate Scientific and Technical Reference
This article is included in
Quality manager
This offer includes:
Knowledge Base
Updated and enriched with articles validated by our scientific committees
Services
A set of exclusive tools to complement the resources
Practical Path
Operational and didactic, to guarantee the acquisition of transversal skills
Doc & Quiz
Interactive articles with quizzes, for constructive reading
Our advice
Bibliography
Also in our database
Reference standards
ISO 9001 paragraph 8.3 "Design and development".
ISO 9000
Exclusive to subscribers. 97% yet to be discovered!
You do not have access to this resource.
Click here to request your free trial access!
Already subscribed? Log in!
The Ultimate Scientific and Technical Reference