8. Our advice
8.1 Draw up a list of data applicable to the design project
The reformulation of a specification in the form of a list of points to be verified, tracked in a table, with for each point the verification action and its expected result, makes it possible to track the input data and their evolutions (version & date) throughout the project. It is established during the review of input elements (requirements) and is kept up to date during the design review stage.
SCROLL TO TOP8.2 Set up a tool to monitor actions taken
...