9. Mistakes to avoid
9.1 Don't neglect to structure your project properly
Failure to take the time needed to structure the project into work packages (WBS), allocating responsibilities to each stakeholder and assigning tasks to them (DOW), could have serious consequences for the project's progress.
SCROLL TO TOP9.2 Don't forget to manage your engineering teams properly
Steering the engineering teams and instituting the design reviews needed to freeze the design will prevent it from being called into question during the procurement...