Practical sheet | REF: FIC1698 V1

OT or WBS task flowchart

Author: Jean-Pierre PAYRE

Publication date: October 10, 2020 | Lire en français

You do not have access to this resource.
Click here to request your free trial access!

Already subscribed? Log in!


3. Formatting the work breakdown structure (WBS)

Depending on the size of the project, the TO can be a simple list of activities or a detailed table of tasks and sub-tasks; either way, it should not be underestimated.

Picto outil Tool

The example of a project breakdown structure (Tool Example of a project breakdown structure ) proposes a structure for the EO

You do not have access to this resource.

Exclusive to subscribers. 97% yet to be discovered!

You do not have access to this resource.
Click here to request your free trial access!

Already subscribed? Log in!


The Ultimate Scientific and Technical Reference

A Comprehensive Knowledge Base, with over 1,200 authors and 100 scientific advisors
+ More than 10,000 articles and 1,000 how-to sheets, over 800 new or updated articles every year
From design to prototyping, right through to industrialization, the reference for securing the development of your industrial projects

This article is included in

Design and engineering management

This offer includes:

Knowledge Base

Updated and enriched with articles validated by our scientific committees

Services

A set of exclusive tools to complement the resources

Practical Path

Operational and didactic, to guarantee the acquisition of transversal skills

Doc & Quiz

Interactive articles with quizzes, for constructive reading

Subscribe now!

Ongoing reading
Formatting the work breakdown structure (WBS)