What happens if there is a cost drift before the T0 date?
The cumulative balance sheet, the dashboard of a project's economic performance
Practical sheet REF: FIC1205 V1
What happens if there is a cost drift before the T0 date?
The cumulative balance sheet, the dashboard of a project's economic performance

Author : Jean DAUVERGNE

Publication date: March 10, 2013 | Lire en français

Logo Techniques de l'Ingenieur You do not have access to this resource.
Request your free trial access! Free trial

Already subscribed?

3. What happens if there is a cost drift before the T0 date?

Among the risks inherent in the project, some may lead to higher costs than expected:

  • cost of design, prototyping and testing,

  • other expenses (market research),

  • but also investment,

with obvious repercussions on the entry ticket.

Using the previous example (§3), the entry ticket is increased from 10 to 20,000 k€. The previous figure shows that the breakeven point is shifted by one year, and that the profit generated is down by 50,000 k€.

You do not have access to this resource.
Logo Techniques de l'Ingenieur

Exclusive to subscribers. 97% yet to be discovered!

You do not have access to this resource. Click here to request your free trial access!

Already subscribed?


Article included in this offer

"Design and engineering management"

( 337 articles )

Complete knowledge base

Updated and enriched with articles validated by our scientific committees

Services

A set of exclusive tools to complement the resources

View offer details