    3. What happens if there is a cost drift before the T0 date?

    Among the risks inherent in the project, some may lead to higher costs than expected:

    • cost of design, prototyping and testing,

    • other expenses (market research),

    • but also investment,

    with obvious repercussions on the entry ticket.

    Using the previous example (§3), the entry ticket is increased from 10 to 20,000 k€. The previous figure shows that the breakeven point is shifted by one year, and that the profit generated is down by 50,000 k€.

    You do not have access to this resource.

    Exclusive to subscribers. 97% yet to be discovered!

    You do not have access to this resource.
    Click here to request your free trial access!

    Already subscribed? Log in!


    The Ultimate Scientific and Technical Reference

    A Comprehensive Knowledge Base, with over 1,200 authors and 100 scientific advisors
    + More than 10,000 articles and 1,000 how-to sheets, over 800 new or updated articles every year
    From design to prototyping, right through to industrialization, the reference for securing the development of your industrial projects

    This article is included in

    Design and engineering management

    This offer includes:

    Knowledge Base

    Updated and enriched with articles validated by our scientific committees

    Services

    A set of exclusive tools to complement the resources

    Practical Path

    Operational and didactic, to guarantee the acquisition of transversal skills

    Doc & Quiz

    Interactive articles with quizzes, for constructive reading

    Subscribe now!

    Ongoing reading
    What happens if there is a cost drift before the T0 date?