3. What happens if there is a cost drift before the T0 date?
Among the risks inherent in the project, some may lead to higher costs than expected:
cost of design, prototyping and testing,
other expenses (market research),
but also investment,
with obvious repercussions on the entry ticket.
Using the previous example (§3), the entry ticket is increased from 10 to 20,000 k€. The previous figure shows that the breakeven point is shifted by one year, and that the profit generated is down by 50,000 k€.
Exclusive to subscribers. 97% yet to be discovered!
You do not have access to this resource.
Click here to request your free trial access!
Already subscribed? Log in!
The Ultimate Scientific and Technical Reference
This article is included in
Design and engineering management
This offer includes:
Knowledge Base
Updated and enriched with articles validated by our scientific committees
Services
A set of exclusive tools to complement the resources
Practical Path
Operational and didactic, to guarantee the acquisition of transversal skills
Doc & Quiz
Interactive articles with quizzes, for constructive reading
What happens if there is a cost drift before the T0 date?
Bibliography
Also in our database
Exclusive to subscribers. 97% yet to be discovered!
You do not have access to this resource.
Click here to request your free trial access!
Already subscribed? Log in!
The Ultimate Scientific and Technical Reference