2. Apply PERT network construction methodology
To create and operate a PERT network, there are six main stages.
2.1 Draw up a task list
The first step is to draw up a task list:
give an exhaustive list of the tasks to be performed;
evaluate the duration of tasks and determine the resources needed to accomplish them ;
codify tasks to facilitate network construction (A, B, C, D, etc.).
Exclusive to subscribers. 97% yet to be discovered!
You do not have access to this resource.
Click here to request your free trial access!
Already subscribed? Log in!
The Ultimate Scientific and Technical Reference
This article is included in
Design and engineering management
This offer includes:
Knowledge Base
Updated and enriched with articles validated by our scientific committees
Services
A set of exclusive tools to complement the resources
Practical Path
Operational and didactic, to guarantee the acquisition of transversal skills
Doc & Quiz
Interactive articles with quizzes, for constructive reading
Apply PERT network construction methodology