2. Apply PERT network construction methodology
To create and operate a PERT network, there are six main stages.
2.1 Draw up a task list
The first step is to draw up a task list:
give an exhaustive list of the tasks to be performed;
evaluate the duration of tasks and determine the resources needed to accomplish them ;
codify tasks to facilitate network construction (A, B, C, D, etc.).
Exclusive to subscribers. 97% yet to be discovered!
Already subscribed? Log in!
Apply PERT network construction methodology
Article included in this offer
"Design and engineering management"
(
337 articles
)
Updated and enriched with articles validated by our scientific committees
A set of exclusive tools to complement the resources