2. Prepare industrial diagrams for your projects
This stage will save time in the quotation phase, enabling you to decide which industrial layout to choose for each product:
internal production and by country in the case of multinationals;
orientation by geographic market (e.g. manufacturing in China for the Chinese market...) ;
orientation according to the quality requirements of the specifications ;
pre-selection of qualified subcontractors by product type.
As the bidding phases are fairly short and represent a cost that is not always recouped, it is important to have pre-established industrial diagrams for putting together bids with the best in-house manufacturing or subcontracting solutions.
The two most important factors...
Exclusive to subscribers. 97% yet to be discovered!
You do not have access to this resource.
Click here to request your free trial access!
Already subscribed? Log in!
The Ultimate Scientific and Technical Reference
This article is included in
Design and engineering management
This offer includes:
Knowledge Base
Updated and enriched with articles validated by our scientific committees
Services
A set of exclusive tools to complement the resources
Practical Path
Operational and didactic, to guarantee the acquisition of transversal skills
Doc & Quiz
Interactive articles with quizzes, for constructive reading
Prepare industrial diagrams for your projects
Downloadable tools
Tool
The Make or Buy strategy (Tool ...
Exclusive to subscribers. 97% yet to be discovered!
You do not have access to this resource.
Click here to request your free trial access!
Already subscribed? Log in!
The Ultimate Scientific and Technical Reference