Update the S-curve(s) at the time of the project review to visualize progress, on time and on budget.
The S-curve
Practical sheet REF: FIC1688 V1
Update the S-curve(s) at the time of the project review to visualize progress, on time and on budget.
The S-curve

Author : Jean-Pierre PAYRE

Publication date: October 10, 2020 | Lire en français

Logo Techniques de l'Ingenieur You do not have access to this resource.
Request your free trial access! Free trial

Already subscribed?

2. Update the S-curve(s) at the time of the project review to visualize progress, on time and on budget.

In preparation for the various project reviews, S-curves must be extracted from the baseline, injecting actual schedule data (time positioning and costs incurred).

This is a critical step in gathering information from project team members to the planner, in order to draw up these S-curves.

Progress at the chosen date (of the review) is calculated, and data is provided on both committed work and work still to be committed, in order to visualize the projection at the end of the business.

For each review, the planner will freeze and distribute S-curves showing the actual progress curve, the earliest budgeted curve and the latest budgeted curve. The following deliverables will be provided:

  • a view of the overall project ;

  • a view of engineering...

You do not have access to this resource.
Logo Techniques de l'Ingenieur

Exclusive to subscribers. 97% yet to be discovered!

You do not have access to this resource. Click here to request your free trial access!

Already subscribed?


Article included in this offer

"Design and engineering management"

( 337 articles )

Complete knowledge base

Updated and enriched with articles validated by our scientific committees

Services

A set of exclusive tools to complement the resources

View offer details