Algorithm for creating a Future Reality Tree (FRT)
Using Theory of Constraints (TOC) in project risk management
Practical sheet REF: FIC1223 V1
Algorithm for creating a Future Reality Tree (FRT)
Using Theory of Constraints (TOC) in project risk management

Author : Lionel PUNTOS

Publication date: April 10, 2013 | Lire en français

Logo Techniques de l'Ingenieur You do not have access to this resource.
Request your free trial access! Free trial

Already subscribed?

5. Algorithm for creating a Future Reality Tree (FRT)

The previous TRT team wants to check that obtaining financial and liability immunity doesn't make the water company worse off. They therefore developed an FRT.

Clearly, this fantastic idea runs the risk of creating a culture of laissez-faire and laissez-faire, which is highly detrimental to safety and trust. How can we prevent these negative consequences? It's up to you.

You do not have access to this resource.
Logo Techniques de l'Ingenieur

Exclusive to subscribers. 97% yet to be discovered!

You do not have access to this resource. Click here to request your free trial access!

Already subscribed?


Ongoing reading
Algorithm for creating a Future Reality Tree (FRT)

Article included in this offer

"Design and engineering management"

( 337 articles )

Complete knowledge base

Updated and enriched with articles validated by our scientific committees

Services

A set of exclusive tools to complement the resources

View offer details