Know the origins and vocabulary of the graphic approach
Using Theory of Constraints (TOC) in project risk management
Practical sheet REF: FIC1223 V1
Know the origins and vocabulary of the graphic approach
Using Theory of Constraints (TOC) in project risk management

Author : Lionel PUNTOS

Publication date: April 10, 2013 | Lire en français

Logo Techniques de l'Ingenieur You do not have access to this resource.
Request your free trial access! Free trial

Already subscribed?

1. Know the origins and vocabulary of the graphic approach

1.1 T for Tree, R for Reality

Engineers have long used the graphical approach to better understand accidental sequences:

  • The Fault Tree Analysis (FTA) [FIC 0535] is an extension of the Failure Mode, Effects and Criticality Analysis (FMECA): the starting point is a feared event, which we try to link to all possible causes using logical "and"/"or" gates;

  • the event tree...

You do not have access to this resource.
Logo Techniques de l'Ingenieur

Exclusive to subscribers. 97% yet to be discovered!

You do not have access to this resource. Click here to request your free trial access!

Already subscribed?


Article included in this offer

"Design and engineering management"

( 337 articles )

Complete knowledge base

Updated and enriched with articles validated by our scientific committees

Services

A set of exclusive tools to complement the resources

View offer details