4. Building a generic application
4.1 Specification phase
As shown in figure 25 , the specification phase has as input the planning documents, system requirements, system architecture and safety requirements. On this basis, the first activity is to specify the software requirements, and the second is to specify the overall software tests.
Figure 25 shows the verification phases (dotted arrow). It can be seen that the production...
Exclusive to subscribers. 97% yet to be discovered!
Already subscribed? Log in!
Building a generic application
Article included in this offer
"Railway systems"
(
61 articles
)
Updated and enriched with articles validated by our scientific committees
A set of exclusive tools to complement the resources
Bibliography
Exclusive to subscribers. 97% yet to be discovered!
Already subscribed? Log in!