6. Frequently asked questions

When should the aggregations be carried out?

Aggregations are generally offered:

  • or at the start of the analysis (this is the case, for example, for grouping similar equipment or defining equivalent piping);

  • or at the end of the analysis, once the risk assessment grid has been completed using all the hazardous phenomena.

What are the criteria for considering equipment as similar?

To group equipment together, it must :

  • are of similar design;

  • are located in the same geographical area of the site;

  • have MMRs with equivalent performance criteria (e.g. probability of failure, response time, efficiency);

  • ...
You do not have access to this resource.

Exclusive to subscribers. 97% yet to be discovered!

You do not have access to this resource.
Click here to request your free trial access!

Already subscribed? Log in!


The Ultimate Scientific and Technical Reference

A Comprehensive Knowledge Base, with over 1,200 authors and 100 scientific advisors
+ More than 10,000 articles and 1,000 how-to sheets, over 800 new or updated articles every year
From design to prototyping, right through to industrialization, the reference for securing the development of your industrial projects

This article is included in

Environment

This offer includes:

Knowledge Base

Updated and enriched with articles validated by our scientific committees

Services

A set of exclusive tools to complement the resources

Practical Path

Operational and didactic, to guarantee the acquisition of transversal skills

Doc & Quiz

Interactive articles with quizzes, for constructive reading

Subscribe now!

Ongoing reading
Frequently asked questions