Practical sheet | REF: FIC0259 V1

From an authorization system to a Seveso authorization system

Authors: Gwenaëlle CAMPFORT, Solange VIGER

Publication date: November 10, 2015, Review date: November 27, 2016 | Lire en français

You do not have access to this resource.
Click here to request your free trial access!

Already subscribed? Log in!


4. Mistakes to avoid

4.1 Don't confuse the "Seveso low threshold" regime with the "Seveso high threshold" regime

It's very important to distinguish between the two regimes, as the level of risk prevention required is not the same.

SCROLL TO TOP
You do not have access to this resource.

Exclusive to subscribers. 97% yet to be discovered!

You do not have access to this resource.
Click here to request your free trial access!

Already subscribed? Log in!


The Ultimate Scientific and Technical Reference

A Comprehensive Knowledge Base, with over 1,200 authors and 100 scientific advisors
+ More than 10,000 articles and 1,000 how-to sheets, over 800 new or updated articles every year
From design to prototyping, right through to industrialization, the reference for securing the development of your industrial projects

This article is included in

Environment

This offer includes:

Knowledge Base

Updated and enriched with articles validated by our scientific committees

Services

A set of exclusive tools to complement the resources

Practical Path

Operational and didactic, to guarantee the acquisition of transversal skills

Doc & Quiz

Interactive articles with quizzes, for constructive reading

Subscribe now!

Ongoing reading
Mistakes to avoid