Practical sheet | REF: FIC0215 V1

From authorization to registration

Author: Solange VIGER

Publication date: October 10, 2018 | Lire en français

You do not have access to this resource.
Click here to request your free trial access!

Already subscribed? Log in!


3. Understand the differences between the two plans at farm level

Operators of facilities covered by the environmental authorization regime must comply with the requirements of their prefectoral decree, which are customized to the site, the location of the facilities and the nature of the activities.

For facilities covered by the registration system, standardized requirements are laid down, by heading, by ministerial decree at national level.

SCROLL TO TOP
You do not have access to this resource.

Exclusive to subscribers. 97% yet to be discovered!

You do not have access to this resource.
Click here to request your free trial access!

Already subscribed? Log in!


The Ultimate Scientific and Technical Reference

A Comprehensive Knowledge Base, with over 1,200 authors and 100 scientific advisors
+ More than 10,000 articles and 1,000 how-to sheets, over 800 new or updated articles every year
From design to prototyping, right through to industrialization, the reference for securing the development of your industrial projects

This article is included in

Environment

This offer includes:

Knowledge Base

Updated and enriched with articles validated by our scientific committees

Services

A set of exclusive tools to complement the resources

Practical Path

Operational and didactic, to guarantee the acquisition of transversal skills

Doc & Quiz

Interactive articles with quizzes, for constructive reading

Subscribe now!

Ongoing reading
Understand the differences between the two plans at farm level