2. Draw up an initial status report for each piece of equipment concerned
You carry out an initial inspection of the equipment concerned (tank, sump, etc.) based on the original or reconstituted equipment file, its construction characteristics (material, construction code or standard, coating, if any) and the history of work carried out on the tank (initial inspection, inspections, non-destructive testing, maintenance and repairs, if any), where such information exists.
The initial state can be established in accordance with the recommendations of professional guides recognized by the Minister for the Environment (see "Going further").
Meet regulatory deadlines for initial status.
Exclusive to subscribers. 97% yet to be discovered!
You do not have access to this resource.
Click here to request your free trial access!
Already subscribed? Log in!
The Ultimate Scientific and Technical Reference
This article is included in
Environment
This offer includes:
Knowledge Base
Updated and enriched with articles validated by our scientific committees
Services
A set of exclusive tools to complement the resources
Practical Path
Operational and didactic, to guarantee the acquisition of transversal skills
Doc & Quiz
Interactive articles with quizzes, for constructive reading
Draw up an initial status report for each piece of equipment concerned
Websites
On this site, you can download various professional guides recognized by the French Ministry of the Environment:
Professional guide to scope definition - DT 90
Guide to monitoring civil engineering and structural works - DT 92...
Regulations
Arrêté du 4 octobre 2010 relative à la...
Exclusive to subscribers. 97% yet to be discovered!
You do not have access to this resource.
Click here to request your free trial access!
Already subscribed? Log in!
The Ultimate Scientific and Technical Reference