8. Frequently asked questions
Why was the industrial plant modernization plan implemented?
The industrial plant modernization plan follows three industrial accidents at Ambes in 2007, at Donges in 2008 and on the Crau plain in 2009. The first accident, which resulted in accidental pollution of the Garonne river, was caused by the sudden opening of a tank containing crude oil; the second, which caused a spill of heavy fuel oil into the Loire estuary, was caused by a leak in a refinery transfer pipeline; the third, which resulted in pollution of the soil and subsoil of a nature reserve, was caused by a rupture in a crude oil transport pipeline. The plan was presented by the Minister of Ecology on January 13, 2010.
Can the opening of a reservoir for maintenance be included in the monitoring and inspection plan?
Yes, when the previous internal inspection...
Exclusive to subscribers. 97% yet to be discovered!
You do not have access to this resource.
Click here to request your free trial access!
Already subscribed? Log in!
The Ultimate Scientific and Technical Reference
This article is included in
Environment
This offer includes:
Knowledge Base
Updated and enriched with articles validated by our scientific committees
Services
A set of exclusive tools to complement the resources
Practical Path
Operational and didactic, to guarantee the acquisition of transversal skills
Doc & Quiz
Interactive articles with quizzes, for constructive reading
Frequently asked questions
Websites
On this site, you can download various professional guides recognized by the French Ministry of the Environment:
Professional guide to scope definition - DT 90
Guide to monitoring civil engineering and structural works - DT 92...
Regulations
Arrêté du 4 octobre 2010 relative à la...
Exclusive to subscribers. 97% yet to be discovered!
You do not have access to this resource.
Click here to request your free trial access!
Already subscribed? Log in!
The Ultimate Scientific and Technical Reference