13. Checking the effectiveness of management measures – role of the inspection body
The control of rehabilitation operations and construction measures, carried out by a body independent of the construction companies, will focus on the objectives of the management plan, for example :
-
residual concentration measurements :
in contaminated environments (soil: bottom and sides of excavation, groundwater),
in exposure routes (air in buildings, soil gases, groundwater);
nature and analysis of backfill ;
nature and analysis of arable land brought in (possibly for subsurface soils) ;
verification of the nature and quantities of products disposed of (waste nomenclature, waste tracking slips (BSD), etc.);
-
verification...
Exclusive to subscribers. 97% yet to be discovered!
Already subscribed? Log in!
Checking the effectiveness of management measures – role of the inspection body
Article included in this offer
"Environment"
(
515 articles
)
Updated and enriched with articles validated by our scientific committees
A set of exclusive tools to complement the resources
Bibliography
Exclusive to subscribers. 97% yet to be discovered!
Already subscribed? Log in!