Main objectives of the EPR
Ordinary pressurized water reactors: the EPR project

Add to my library

BN3102 V1 Article

Main objectives of the EPR


Ordinary pressurized water reactors: the EPR project

Authors : Jean-Pierre PY, Michel YVON

Publication date: July 10, 2007 | Lire en français

Add to my library Add to my library

Logo Techniques de l'Ingenieur You do not have access to this resource.
Request your free trial access! Free trial

Already subscribed?

1. Main objectives of the EPR

History of EPR development

The cooperation between France and Germany in the field of nuclear energy for the development of the EPR was unprecedented in the world.

On the industrial side, Framatome and Siemens, Europe's two leading nuclear manufacturers, set up a joint subsidiary in 1989, NPI (Nuclear Power International), to coordinate all EPR development activities. Engineering teams from Framatome and Siemens were joined by those from Électricité de France's equipment department, who were directly involved in the design.

Note: since 2000, Framatome and Siemens have merged their nuclear activities to form Framatome ANP, now AREVA NP.

On the electricity side, EDF and the main German utilities (which in 2007 became E.ON, EnBW, VENE and RWE Power) formed a powerful group representing...

You do not have access to this resource.
Logo Techniques de l'Ingenieur

Exclusive to subscribers. 97% yet to be discovered!

You do not have access to this resource. Click here to request your free trial access!

Already subscribed?


Article included in this offer

"Nuclear engineering"

( 161 articles )

Complete knowledge base

Updated and enriched with articles validated by our scientific committees

Services

A set of exclusive tools to complement the resources

View offer details

Dans les ressources documentaires

Réacteurs à eau sous pression - Fonctionnement normal et accidentel

Les principes généraux de fonctionnement des centrales à réacteur à eau sous pression (REP) font l’objet ...

Réacteurs à eau ordinaire bouillante

La conception du réacteur à eau ordinaire bouillante (REB) découle de celle du réacteur à eau ordinaire s...

Sûreté des centrales nucléaires en France après l'accident de Fukushima

A la suite de l'accident de Fukushima, des évaluations ont été menées par les exploitants nucléaires fran...

Tous les livres blancs
Article EPR de Flamanville : démarrage en vue
11 July 2024
EPR de Flamanville : démarrage en vue

Le réacteur de l’EPR de Flamanville a chargé son combustible mi-mai et devrait diverger en juillet. L’ASN continue de surveiller de près les différentes phases ...