Scheduled maintenance
Combined-cycle power plant - Functioning, operation, example

Add to my library

BE8907 V1 Article

Scheduled maintenance


Combined-cycle power plant - Functioning, operation, example

Author : Jean-Marie MONTEIL

Publication date: January 10, 2004 | Lire en français

Add to my library Add to my library

Logo Techniques de l'Ingenieur You do not have access to this resource.
Request your free trial access! Free trial

Already subscribed?

3. Scheduled maintenance

Maintenance operations on any industrial plant can be divided into two categories:

  • palliative maintenance (repair strictly in response to damage);

  • preventive maintenance (repairs carried out before damage occurs and scheduled according to a method for assessing the degradation of the weakened part).

This paragraph explains why sophisticated methods are used to determine preventive maintenance operations on combined-cycle power plants, but mainly on combustion turbines.

Combustion turbines, whether installed as stand-alone units or in combined-cycle power plants, are designed to generate peak or semi-base load energy, or even to back-up the power grid. As such, they need to be up and running quickly, which places high thermomechanical demands on the...

You do not have access to this resource.
Logo Techniques de l'Ingenieur

Exclusive to subscribers. 97% yet to be discovered!

You do not have access to this resource. Click here to request your free trial access!

Already subscribed?


Article included in this offer

"Energy resources and storage"

( 208 articles )

Complete knowledge base

Updated and enriched with articles validated by our scientific committees

Services

A set of exclusive tools to complement the resources

View offer details

Dans les ressources documentaires

Centrale à cycle combiné - Théorie, performances, modularité

Cet article présente sous un aspect théorique les centrales à cycle combiné, en détaillant la spécificité...

Refroidissement des turbines à gaz - Influence sur le rendement

Les performances des turbines à gaz ont grandement évoluées ces dernières décennies, notamment l’accroiss...

WhitePaper Le pari de l'hydrogène vert
27 April 2023
Le pari de l'hydrogène vert

<span style=\"font-weight: 400\">Le PIIEC doit constituer un tremplin pour faire de l’hydrogène le vecteur énergétique du futur en Europe.</span>

Tous les livres blancs
Article Nouveau défi : moderniser les STEP !
26 April 2016
Nouveau défi : moderniser les STEP !

Les stations de pompage-turbinage sont de plus en plus sollicitées pour stocker l\'électricité lors des phases de forte production des énergies renouvelables in...

Toutes les actualités