Know the connection obligations according to the type of building
Connecting to a district heating or cooling network
Practical sheet REF: FIC1814 V1
Know the connection obligations according to the type of building
Connecting to a district heating or cooling network

Author : Nacer NASRI

Publication date: November 10, 2023 | Lire en français

Logo Techniques de l'Ingenieur You do not have access to this resource.
Request your free trial access! Free trial

Already subscribed?

3. Know the connection obligations according to the type of building

At present, there is no requirement for existing buildings to be connected to a heating network, unless they undergo major renovation.

On the other hand, new buildings (apartment blocks or housing estates) or those undergoing major renovation work must be connected to the existing heating network if it has already been classified, or if they are located within the priority development perimeter served by this same network.

The classification of heating and cooling networks makes it possible to determine whether a new construction or major renovation project located near the network is subject to the obligation to connect.

If the project is located in the network's priority development zone and meets the following criteria, then connection is mandatory:

  • new building...

You do not have access to this resource.
Logo Techniques de l'Ingenieur

Exclusive to subscribers. 97% yet to be discovered!

You do not have access to this resource. Click here to request your free trial access!

Already subscribed?


Ongoing reading
Know the connection obligations according to the type of building

Article included in this offer

"Energy resources and storage"

( 203 articles )

Complete knowledge base

Updated and enriched with articles validated by our scientific committees

Services

A set of exclusive tools to complement the resources

View offer details
Contact us